Mine No.2, Jinchuan Group Co., Ltd.

Time of publication:2026-01-27


Project type:


General contract for equipment for paste lining with a mixture of "full tails + empty rock"



Project description:


Full tails and empty rock are used as lining filler. The mass concentration of the lining is 77%-79%, the strength after 28 days exceeds 5 MPa. Productivity of one system — 100 m³/h, annual volume of laying — more than 500,000 m³.



Results of the project:


Compared to the previously used single-flow rod sand laying, the overall cost of laying is reduced by more than 20%.