Yuanxin Mine, Zhenghe County, Shandong Gold Group

Time of publication:2026-01-27


Project type:


General contract for equipment for laying tails (plum)



Project description:


The tails of the enrichment plant undergo preliminary classification. The large fraction enters the vertical sand bunker, and the plum (small fraction) is directed to the deep cone thickener. This radically eliminates threats to the safety of underground products and allows the maximum extraction of valuable resources from the whole.



Project results:


Solved the complex problem of thickening and deposition of ultra-thin tails (fraction -400 mesh exceeds 80%).