Linlun Gold Mine Shandong Gold Mining (Linlun) Ltd

Time of publication:2026-01-27


Project type:


General contract for sludge filling equipment in the form of granular solution



Project description:


Concentration and sedimentation of the entire tail suspension using a deep cone concentrator (NGT16) with a filling density of 70-72%, the system performance is 100 m³ / h.



Project results:


The unique design combining a vertical mixer with a horizontal mixer solves the problem of homogeneity of mixing viscous materials.